Showing posts with label SmartCity. Show all posts
Showing posts with label SmartCity. Show all posts

Sunday, 3 May 2015

All you need to know about 'Smart Cities' in India !

PM Modi had announced his vision to set up 100 smart cities across the country soon after his government was sworn into power mid last year. Since then a race has been on among cities to land on the list that the ministry of urban development is compiling. The 100 smart cities mission intends to promote adoption of smart solutions for efficient use of available assets, resources and infrastructure. Dipak Dash explains what these smart cities are and how they will work.

Wednesday, 3 December 2014

Application Procedure Part 3



Application Procedure for SALT RESISTANCE PRIMER
Existing Salt Efflorescence Problem- Old Construction




To overcome the SALT problem steps involved in the treatment are-

1.      Clean the surface (surface has to be free from Salt, loose dust, oil Paints, grease & algae.) Clean the surface using Wire brush/ Nylon Brush/Scrapper/ metal plate to chip of the tough paint peel & Water. Special care has to be taken for scrapping of the salt.

2.      Apply uniform layer of Mx Seal Prime-50 Solution 2 Coat with brush on the effected scrubbed substrate. (Apply the 2 coats with in interval 1 Hr) Leave it for 1 or 2 Days.

3.      If again Salt Precipitate are Seen, Then again scrap the salt and apply 1 Coat of Mx Seal Prime-50 and 2 coat of Mx Seal Prime ’P’ and leave it for a day.

4.      After the salt is being treated apply Water /Acrylic base Paints.




 









                                                             After Coating
         Before Coating  

New Construction
  
 1.      Repeat Step 1 & 2.
 2.      Apply 2 coat of Mx Seal Prime 50 in area of normal salt content
 3.      Apply 2 coat of Mx Seal Prime 50 + 1 coat of Mx Seal Prime 
 



Application Procedure on Wall Area:-


To overcome HEAT problem steps involved in the treatment are-


1.   Clean Wall surface (surface has to be free from
 loose dust, oil, grease, bitumen & algae.) Clean 
the surface using Wire brush/ Nylon Brush/Scrapper & Water.

2.   Wash the surface thoroughly with water 
using pressure pumps.

3.   Apply uniform layer of one coat Mx SealPrime 
Solution with brush/ Roller on substrate.

4.   After duration of drying of 3-4 hrs apply 2 coats of Mx COOL WRAP
Plus with brush/ Roller/ spray. ( at interval on 3-4 hrs)

5.   For full curing let the coating dry for 12 hrs.

 

Tuesday, 2 December 2014

Application Procedure Part 2




Application Procedure for Cooling on Asbestos sheet:-



1.       Clean Asbestos sheet surface (surface has to be free from loose dust, oil, grease, bitumen & algae.) Clean the surface using Wire brush/ Nylon Brush/Scrapper & Water.

 

2.       For old asbestos sheet- when algae/ fungus is maximum on the asbestos sheet, then used dil solution of hydrogen per oxide ( 5%) for removal of fungus.



3.       Wash the surface thoroughly with water using pressure pumps.



4.       Apply uniform layer of MX COOL GUARD Solution with brush/ Roller on substrate. ( First coat is diluted for increase the coverage)



5.       After duration of drying of 1-2 hrs apply 2nd coat of MX COOL GUARD with brush/ Roller/ spray.



6.       After 1-2 hrs, apply 2 coat of Transcoat. ( At the interval of 1-2 hrs)



7.       For full curing let the coating dry for 12 hrs.



Note: - Before application of every layer, the substrate should be clean & dust free.


Preparation of Mx Cool Guard Solution on the site. 


·         Take 700 ml water in bucket.

·          Add powder of Mx cool guard to the water along with stirring and make a viscous paste like emulsion.

·         Add more water up to 500 ml to the above viscous emulsion with regular stirring to make brushable emulsion.

·         Apply the coating on the clean substrate.

·         Prepared Mx cool guard solution can be used till 2 hrs after mixing.

·         Prepared solutions should not be kept uncovered, when not in use.



·         Note: - For application of 1st coat of Mx cool guard take 1000 ml – 1300 ml water in bucket for making Mx Cool Guard solution and other step are follow as given above.

 

 Application Procedure for Cooling on old metal sheet:-



  1. Clean metal sheet surface (surface has to be free from loose dust, oil, grease, bitumen & algae.) Clean the surface using Wire brush/ Nylon Brush/Scrapper & Water.



  1.  For old/ new metal sheet- when corrosion is found, then apply Rustop on the surface with cotton cloth / rug. After 10 min of application, rub the surface and remove the corrosion. Wipe off the excessive Rustop.



  1. Wash the surface thoroughly with water using pressure pumps.



  1. Apply uniform layer of MX COOL GUARD Solution with brush/ Roller on substrate.



  1. After duration of drying of 1-2 hrs apply 2nd coat of MX COOL GUARD with brush/ Roller/ spray.



  1. After 1-2 hrs apply 2 coat of Transcoat. ( At the interval of 1-2 hrs)



  1. For full curing let the coating dry for 12 hrs.



8.       Note: - Before application of every layer, the substrate should be clean & dust free.


Preparation of Mx Cool Guard Solution on the site. 

·         Take 700 ml water in bucket.

·          Add powder of Mx cool guard to the water along with stirring and make a viscous paste like emulsion.

·         Add more water up to 500 ml to the above viscous emulsion with regular stirring to make brushable emulsion.

·         Apply the coating on the clean substrate.

·         Prepared Mx cool guard solution can be used till 2 hrs after mixing.

·         Prepared solutions should not be kept uncovered, when not in use. 

Application Procedure For Mx. Cool Wrap:-


To overcome HEAT problem steps involved 
in the treatment are-

1.  Clean the surface (surface has to be free
 from loose dust, oil, grease, bitumen, 
Corrosion & algae.) Clean the surface
 using Wire brush/ Nylon Brush/Scrapper & Water.

2.   Apply uniform layer of MX Cool Wrap 
Solution with brush/ Roller/ spray on substrate.

3.   After duration of drying of 5-6 hrs apply
 2nd coat of MX COOL WRAP with 


brush/ Roller/ spray.

4.   For full curing let the coating dry for 12 hrs.

Preparation of Mx Cool Wrap Solution on the site. 
·         Take Part A and Part B and mix to each other with help of Stirrer.
·         MX Cool Wrap Solution should be used within half hr to 1 hr of mixing. ________________________________________________________________________